IC 74245 PDF

Lead Small Outline Integrated Circuit (SOIC), JEDEC MS, Wide. DM74LSSJ. M20D. Lead Small Outline Package (SOP), EIAJ TYPE II. 74LS, 74LS Datasheet, 74LS Octal Bus Transceiver Tri-State Datasheet, buy 74LS, 74LS pdf, ic 74LS Details, datasheet, quote on part number: . IC VOLTAGE DETECTOR V TO Specifications: Output: Open Drain or Open Collector ; Reset: Active.

Author: Nikolrajas Vojind
Country: Guatemala
Language: English (Spanish)
Genre: Environment
Published (Last): 10 February 2016
Pages: 453
PDF File Size: 11.17 Mb
ePub File Size: 11.51 Mb
ISBN: 428-9-56202-178-3
Downloads: 66667
Price: Free* [*Free Regsitration Required]
Uploader: Fekazahn

It must be in position OFF at the time of its connection on the sector. The stitching of this circuit is indicated on figure Form of the perso pages. It is thus enough to a little attention to observe the phenomenon and if there would remain oc points obscure, do not hesitate to start again several times the experiment. As you can note it, the frequencies spread out of 5 Hz with 0, Hzi. L0 and L1 flicker then ci the rate of 10 Hz. Indeed, L0 still flickers, ordered by the signal coming from CP1 ; on the other hand L1 74425 not flicker any more.

This is due to the fact that the exit of door 2 of figure 15 is at the high level whereas that of door 1 is on the bottom grade thus prohibiting the B8 direction towards A8.

After the sixteenth clock pulse, the incrementing of the indication of the bill-posters starts, this one being in hexadecimal code, of 00 to finish to FF at the end of counting. Forms maths Geometry Physics 1. The door of ci NAND is followed of a trigger of Schmitt who is used to improve quality of the signal, then come two reversers which control the chain of dividers.

It presents a luminosity weaker than the normal. High of page Preceding page Following page. To check if the ci goes indeed from B8 towards A8repeat the same procedure as for the preceding case.

  LORAD PARTS PDF

IC 74LS245/74245 DIP20

774245 By observing the LED and the bill-posterscheck the correct operation of the meter by consulting the table of figure Observe what occurs on I.

The most significant bit M. A higher tension could damage it. To carry out the following experiments, it will be necessary to use a meter. Electronic forum and Poem. This is symbolized by a bubble placed on the entry f1 in figure To contact the author.

Will finally know that the circuit 74LS is a circuit of technology T. L1 ignites with its full intensity. You have just checked the two directions of transmission of the signal between A8 and B8 of the one kc the eight ways of the integrated circuit. In this first phase, you will check the operation of the one of the eight bidirectional buffers of the integrated circuit.

SN , Tube SN; R̦hre SN ID, IC РIntegra

The figure b represents the diagram of the electric circuit carried out. In the preceding practices, you tried out various types of meters ; that that you will examine now is not different from the others as for its design, but it has the great advantage of containing 12 stages in a single integrated circuit.

Rock then SW1 on position 0 to validate the circuit again. On the twelve exits of 74425 with Q12 74254, one finds a number 72445 of twelve bits active of: Now reverse the direction of transmission by applying the rectangular signal provided by CP1 to the B8 entry.

Of course, it is not a question to hope the clock pulses up to to check the table: Operational test of a Meter on 12 floors. It is about the CDbinary asynchronous meter with 12 bitswhose synoptic diagram is represented figure The meter is incremented each time the entry f1 passes from the high level on the bottom grade, i.

Electronic forum and Infos. The meter can go from 0 to 2 12 positions. You thus noted that L1 can be ordered independently of the buffer which, not validated, does not intervene.

  EL INNOMBRABLE BECKETT PDF

By commenting on the experiment, one can say that each stage of the meter carries out a division by two of the frequency of the signal applied to its entry ; if one injects the signal with 10 Hzcoming from contact CP1at the entry f 1 of the meter, the various exits, one obtains signals whose frequency is each time reduced by half.

Static page of welcome. Indeed, when SW0 is in position 1the passage of the signal in the direction of A8 with B8 is authorized. The electric diagram of the circuit carried out is represented figure b, while the figure c represents its synoptic diagram. Adopt the same procedure for the seven other ways in order to check correct operation. The table of figure 23 indicates the 74425 and the period of the signals of the various stages of the meter and summarizes the test results.

To carry out the experiments envisaged in this practice, it will be necessary for you to use the following material: Click here for the following lesson 7445 in the synopsis envisaged to this end. At boundaries 2, 3, 4, 5, 6, 7, 8 and 9 can be connected eight lines of A1 to A8and eight others can be connected to pins 18, 17, 16, 15, 14, 13, 12 and 11 of B1 with B8.

L and that, for this reason, it must be fed with a stable tension of 5 V. Dynamic page of welcome.

The entry RESET gives the meter to zero, it is asynchronous ; as soon as a level H is applied to him, the meter passes to 0. How to make a site? Return to the synopsis.

You can notice the sign represented inside each buffer ; it indicates that the buffers used comprise a circuit of re-arrangement of the trigger type of Schmitt.