HUAWEI BTS3900 INSTALLATION MANUAL PDF

BTS GSM Installation Guide(V_13).pdf – Download as PDF File .pdf), and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. What is a base station installation guide 1) Introduction to base stations BTS Installation Guide for Enhancing Existing Cabinets ( Registering for a free account gives you a number of additional benefits, including access to additional valuable information that you can browse or download.

Author: Nemi Turn
Country: Philippines
Language: English (Spanish)
Genre: Life
Published (Last): 21 November 2016
Pages: 186
PDF File Size: 8.90 Mb
ePub File Size: 12.7 Mb
ISBN: 841-6-23054-274-9
Downloads: 87230
Price: Free* [*Free Regsitration Required]
Uploader: Melabar

In this scenario, two 80A input power cables are used for upper and lower shelves.

HUAWEI BTSL INSTALLATION MANUAL Pdf Download.

Based on the application scenarios, base stations include series base stations, micro base stations, and pico base stations. RF module and the BBU. Before the installation, pay attention to the following items: To meet customer requirements, we supply various installaton guides, which are listed as follows: Cables are routed in an untangled and orderly fashion.

The number of onsite personnel depends on the engineering schedule and installation environment.

Disconnect the equipotential cable from the lower part of the door. Optional installing A Cpri Optical Fiber The performance of an optical module that is exposed to the air for more than 20 minutes may be abnormal. Comments to this Manuals Your Name.

Page The connectors of the RF cables are fixed in position to avoid false connection that may cause an abnormal voltage standing wave ratio VSWR. Page CPRI fiber optic cables are routed out of the cabinet through the nearer left or right cable outlet. Installation Guide 8 Installing the Cabinet Context When installing a BTSL on a base, use a marking template matching iinstallation base to determine the positions of the holes for buawei the cabinet.

Page 68 Gently slide the board into the slot.

  FUNDAMENTALS OF NANOELECTRONICS HANSON PDF

Step 2 Lay out the cable according to the instructions in Cabling Requirements and use cable ties to bind it. M12x60 bolts to secure the base, as shown in Figure For details, see Attaching mxnual Sign Plate Label. Route the PGND cables along the left side inside the cabinet.

Two battery cabinet should stack. CPRI fiber optic cables are routed out of the cabinet through the nearer left or right cable outlet. Command Conventions The command conventions that may be found in this document are defined as follows.

Preparing For Installation 2. Page 57 The figure of the GPS surge protector is for reference only. Indoor Cabling Requirements Cables are routed indoors through the feeder window.

Procedure Step 1 Determine the position of the cabinet by referring to the marking template, as shown in Figure The figure of the GPS surge protector is for reference only. This document applies to sites where computers cannot be used to view the documents.

Group Post User Document. To print the manual completely, please, download it. Install the equipotential cable on the door. Page 39 If the resistance is greater than or equal to five megohms, you can infer that the cabinet is insulated from the floor.

The cabinet door can be removed before the cabinet is installed for easy operations. Installing The Monitoring Signal Cables — The optical modules and fiber optic cables are of the multimode type.

The total number lnstallation not tally with the Find out the cause and report any missing packing list articles to the local Huawei office.

Welcome to Our Website

The cabinets are installed in a row in the same equipment room for easy cabling. Btsl gsmBtsl lteBtsl wcdma. Cable clips must be vertical with cables, and the cables in a cable clip must be parallel. Press the keys in turn. What a great Library! Step 3 Remove the cabinet door to facilitate operations, as shown in Figure Remove the board, and check whether any pin of the slot on the backplane is bent, broken, or missing.

  ISO 15665 PDF

Page 79 Locate the cables around the binding bracket according to the figures showing the spatial positions of the cables.

Page 97 Lower the puller on the optical module. Page 38 Step 5 Use a level to check the cabinet level, as shown in Figure Page 43 M12x60 bolts to secure the base, as shown in Figure Small Configuration Scenario Iii: Product Versions The following table lists the product versions related to this document. Page 84 Step 5 Use a screwdriver to tighten the screws on the wiring terminals.

3900 Series & 5900 Series Base Station Installation Guides

Page 67 When inserting a board into a slot, keep the board on the same plane as the slot. It also provides checklists for hardware installation. Quick Installation Guide A simplified graphical document, which can be printed and easily carried.

New deployment This document applies to sites where computers cannot be used to view the documents. Installing The Power Cables In the case of full configuration with 12 RFUs, connect the input power cables and supply the power to the cabinet.

All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Locate the cables around the binding bracket according to the figures showing the spatial positions of the cables. Small Configuration Scenario Ii: If the resistance is greater than or equal to five megohms, you can infer that the cabinet is insulated from the floor.